当前位置:希尼尔首页 > 翻译新闻 >
公司中标上市公司国际招标翻译工作
公司中标上市公司国际招标翻译工作
编辑:青岛希尼尔翻译公司 | 发布时间:2019-05-27 |
公司今日再次中标国内钢铁上市公司翻译招标,在10余家翻译公司中脱颖而出,获得客户的充分认可,现将评标标准摘录如下,看看公司是如何获得高分的。
评标委员会对通过技术评议的投标人进行综合评分步骤,即:商务评价、服务评价、技术评价、价格评价。Bids which are validated in technical review shall be subject to the following comprehensive scoring procedures: commercial review, service review, technical review and price review.
投标人综合得分=商务评议(权重10%)+服务评议(权重10%)+技术评议得分(权重40%)+价格评议得分(权重40%) 具体评价标准见附件1、2、3、4。 Comprehensive score = Commercial review (weighting 10%) + service review (weighting 10%) + technical review (weighting 40%) + price review (weighting 40%).
附件1、商务评价表(权重10%)
序号 |
内
容 |
标准分 |
投标人名称 |
|||||
|
|
|
|
|
||||
1 |
业绩(共40分,根据下列标准评分) 自2004年1月1日起至开标日的国内钢铁厂1780mm以上的生产线及以上同类工程业绩 |
40分 |
|
|
|
|
|
|
最低分为0分,最高分为40分
提供整套生产线技术业绩最多者为满分,其余按照名次得分,得分值以几何级数递减,最后名次为0分。 |
|
|
|
|
|
|
||
2 |
付款条件及方式:付款条件最优者得满分,次优者满分基础上减2分,第三优者在满分的基础上减4分,以此类推。
符合招标文件要求的付款条件和方式,得最高评价值。在此基础上,将按照招标文件中规定的利率计算提前支付所付的利息(及招标人可能增加的风险),并按照投标资料表的规定,依据利息值多少降低评价值。 |
20分 |
|
|
|
|
|
|
3 |
近五年来企业状况、正在执行合同情况及履约能力。(投标书中要有资料支持) |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
20 |
|
|
|
|
|
4 |
合作承诺、项目执行措施 |
20 |
|
|
|
|
|
Appendix 1:
Commercial Evaluation Table (weighing 10%)
No. |
Contents |
Standard score |
Name of
bidder |
|||||
|
|
|
|
|
||||
1 |
Performance (full score
40, the scoring shall be based on the following standard) From January 1, 2004 to
the bid opening date, domestic steel plant has production line more
than 1780mm and more superior engineering performance
|
40
|
|
|
|
|
|
|
The lowest score is 0 and
highest score is 40 The bidder who may provide
the complete production line shall have the full score in technical
performance. The score of other bidders shall be given according to
the ranking. The score shall decrease geometrically and the score of
the last place shall be 0. |
|
|
|
|
|
|
||
2 |
Payment conditions and mode:
The bidder who offers the optimal payment conditions shall get the
full score. The one in the second place shall get a score which is 2
points less than the full score, the one in the third place shall
get a score which is 4 points less than the full score and
accordingly. The bidder who offers
payment conditions and mode in full compliance with provisions of
the Tender Document shall get the full score. On this basis, the
interest (together with possible more risks on the part of the
Tenderee) to be paid in advance shall be determined using the
interest rate specified in the Tender Document. The evaluation value
shall be decreased according to the interest value and in accordance
with provisions of the table on biding materials. |
20
|
|
|
|
|
|
|
3 |
Corporate conditions of last
five years, contracts under performance and performance capacity.
(these shall be supported by materials given together with the bid) |
Each member of the committee
shall independently sort the bidders in respect of this evaluation
content (the ranking number shall be a whole number starting from
“1”. The one ranked first shall be numbered “1”, the one ranked
second shall be numbered “2” and accordingly). The average of
ranking numbers shall be sorted in an ascending order. The one
ranked first shall get a score of 20, the one ranked second shall
get a score of 10 and the one ranked third and subsequent places
shall get a score of 0. |
20 |
|
|
|
|
|
4 |
Cooperation commitments and
project implementation measures |
20 |
|
|
|
|
|
附件3、服务评价表(权重10%)
序号 |
项目 |
标准分 |
分项项目 |
分项标准分 |
说明 |
1 |
图纸资料供应 |
40 |
资料的齐全程度 |
17 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
资料的内容深度 |
17 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
|||
参考图纸资料的数量 |
6 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
|||
2 |
人员派遣 |
30 |
设计各阶段人员派遣的合理性,满足设计结合要求 |
10 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
合作制造阶段人员派遣的合理性,满足设备监制要求 |
5 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
|||
现场安装、调试阶段人员派遣的合理性,满足设备安装调试要求 |
15 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
|||
3 |
人员培训 |
20 |
理论培训 |
6 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
业绩工厂培训 |
6 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
|||
现场培训 |
8 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
|||
4 |
备件提供 |
10 |
提供的一年备件清单的完整性、合理性 |
5 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
提供的调试备件清单的完整性、合理性 |
5 |
由评标委员会成员独立对投标人该项评价内容进行排序(排序序号为从“ |
Appendix 3:
Service Evaluation Table (weighing 10%)
No. |
Items |
Standard score |
Sub-items |
Standard score of sub-items |
Descriptions |
1 |
Supply of
drawings |
40 |
Completeness of
materials |
17 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of
17, the one ranked second shall get a score of 10, the one
ranked third shall get a score of 3 and subsequent places shall
get a score of 0. |
Depth of contents of
materials |
17 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of
17, the one ranked second shall get a score of 10, the one
ranked third shall get a score of 3 and subsequent places shall
get a score of 0. |
|||
Quantity of drawings for
reference |
6 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 6,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
|||
2 |
Dispatch
of personnel |
30 |
Rationality in personnel
dispatch during each design stage, meeting design needs |
10 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of
10, the one ranked second shall get a score of 5, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
Rationality in personnel
dispatch during cooperative manufacturing stage, meeting
equipment manufacturing supervision requirements |
5 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 5,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
|||
Rationality in personnel
dispatch during on-site installation and commissioning stage,
meeting equipment installation & commissioning requirements |
15 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of
15, the one ranked second shall get a score of 10, the one
ranked third shall get a score of 5 and subsequent places shall
get a score of 0. |
|||
3 |
Training
of personnel |
20 |
Theoretical training |
6 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 6,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
Plant training on
performances |
6 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 6,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
|||
On-site training |
8 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 8,
the one ranked second shall get a score of 4, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
|||
4 |
Supply of
spare parts |
10 |
Completeness and
rationality of list of spare parts for use for one year |
5 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 5,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
Completeness and
rationality of list of spare parts for equipment commissioning |
5 |
Each member of the
committee shall independently sort the bidders in respect of
this evaluation content (the ranking number shall be a whole
number starting from “1”. The one ranked first shall be numbered
“1”, the one ranked second shall be numbered “2” and
accordingly). The average of ranking numbers shall be sorted in
an ascending order. The one ranked first shall get a score of 5,
the one ranked second shall get a score of 3, the one ranked
third shall get a score of 1 and subsequent places shall get a
score of 0. |
来源:青岛希尼尔翻译公司http://www.sinosenior.com.cn,转载请注明出处