投标报价汇总表TENDER SUM SUMMARY
原创文章:青岛希尼尔翻译公司 http://www.sinosenior.com.cn
2015-3-18
TENDER SUM SUMMARY | SUBTOTAL | TOTAL COST | ||||
投标报价汇总表 | 小计 | 总计 | ||||
1 | Plant (phase 1) 一期厂房 | 0 | ||||
A | Civil & Structure 土建工程 | 0 | ||||
A1 | Foundation 基础 | |||||
A2 | Super Structure 上部结构 | |||||
A3 | Plant Roof 生产车间屋面 | |||||
A4 | Stairs and Ramps 楼梯及坡道 | |||||
A5 | Eeternal Walls & Canopy 外墙及悬挑雨篷 | |||||
A6 | Doors and Wndows 门窗 | |||||
A7 | Internal Walls 内墙 | |||||
B | Internal Fit-out works 室内装修 | 0 | ||||
B1 | Partitions 隔断 | |||||
B2 | Wall Finishes 墙面装修 | |||||
B3 | Flooring Finishes 地面装修 | |||||
B4 | Ceiling Finishes 天棚装修 | |||||
B5 | FF&E 固定装置、家具及设备 | |||||
B6 | Anti-collision Facilities 防撞设施 | |||||
C | Services 机电工程 | 0 | ||||
C1 | Water supply and drainage system 给排水系统 | |||||
C2 | Waster Water treatment system 污水处理系统 | |||||
C3 | Fire Service 消防系统 | |||||
C4 | Electrical system 电气系统 | |||||
C5 | Lighting system and others 照明系统及其他 | |||||
C6 | Lightning protection & Grounding system 防雷接地系统 | |||||
C7 | Automatic fire alarm system 火灾自动报警系统 | |||||
C8 | HVAC 暖通系统 | |||||
C9 | Process Piping 工艺管道系统 | |||||
2 | Goods Storage & Packaging Storage 货品仓库及打包材料仓库 | 0 | ||||
A | Civil & Structure 土建工程 | 0 | ||||
A1 | Foundation 基础 | |||||
A2 | Super Structure 上部结构 | |||||
A3 | Storage Roof 仓库屋面 | |||||
A4 | Ramps 坡道 | |||||
A5 | Eeternal Walls & Canopy 外墙及悬挑雨篷 | |||||
A6 | Doors and Wndows 门窗 | |||||
A7 | Internal Walls 内墙 | |||||
B | Internal Fit-out works 室内装修 | 0 | ||||
B1 | Wall Finishes 墙面装修 | |||||
B2 | Flooring Finishes 地面装修 | |||||
B3 | Ceiling Finishes 天棚装修 | |||||
B4 | 竣工清理 | |||||
C | Services 机电工程 | 0 | ||||
C1 | Water supply and drainage system 给排水系统 | |||||
C2 | Fire Service 消防系统 | |||||
C3 | Electrical system 电气系统 | |||||
C4 | Lighting system and others 照明系统及其他 | |||||
C5 | Lightning protection & Grounding system 防雷接地系统 | |||||
C6 | Automatic fire alarm system 火灾自动报警系统 | |||||
3 | Ancillary Room 辅助房 | 0 | ||||
A | Pump Room 水泵房 | |||||
B | Guard House 门卫 | |||||
4 | External Work 室外工程 | 0 | ||||
A | Planting 绿化 | |||||
B | Exterior MEP Service 室外机电 | |||||
C | Substation 变电站 | |||||
D | Road and Yard 道路及广场 | |||||
E | Logistics Loading Zone 装卸货区 | |||||
F | Car Parking 停车场 | |||||
G | Fencing 围墙 | |||||
H | Dock Leveler 提升装置 | |||||
TOTAL DIRECT COST直接费总计 | 0 | |||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
FIXED LUMP SUM PRICE 固定总价: | 0 | |||||
9 | PROVISIONAL SUM 暂列金额表 | |||||
TOTAL TENDER PRICE 总投标价: | 0 |